ICI has supported clients with the implementation of new Colorado Oil and Gas Conservation Commission (COGCC) flowline regulations. Projects included post- and pre-construction data gathering and gap analysis, development of O&M manuals and procedures, and internal audit support. ICI has also supported clients with the collection of the best quality Geographic Information Systems (GIS) specifications, allowing for efficient submission, review, and management of flowline integrity data.
ICI has experience with several urban pipeline installation projects. Support included managing the installation of valves and meter stations, pipeline commissioning, and closeout. One project included managing the installation of 8 miles of pipeline through an urban area, with 4 mainline valves, 13 regulator feeds, and 5 jack and bore segments.
ICI supported client with a four month PHMSA inspection during construction of 41 miles of crude oil pipeline in Colorado. Inspection included a review of procedures and records for all construction activities including stringing, welding, non-destructive testing, coating, backfilling, pressure testing, and horizontal directional drilling.
ICI has helped numerous clients with data and records management. ICI has evaluated construction and compliance records and record keeping systems, identifying gaps, and making recommendations to efficiently meet regulatory and company requirements. ICI has gathered, scanned and organized critical records such as mill test reports, as-built drawings, pressure test records, field notes, and repair data. Pipeline records are essential for compliance and day-to-day operational needs. We can help your company develop a good record keeping structure.
ICI has extensive compliance experience, and has provided compliance training for project managers, engineers, construction employees, and field employees. The pipeline compliance training covers:
ICI has developed Standard Operating Procedures (SOPs) for clients that comply with Process Safety Management (PSM) and PHMSA 49 CFR Part 192 and 195 regulations. All modes of process operation were addressed, including:
ICI is currently managing a natural gas pipeline replacement project which involves installation of 50 miles of new pipe through urban and open areas in San Diego County, California.